16.5 C
Herceg Novi
Friday, November 22, 2024
spot_img
Supported byspot_img
spot_img
NewsSomsol Company plans to build a 240 MW solar power plant

Somsol Company plans to build a 240 MW solar power plant

The Podgorica company Somsol plans to build a solar power plant in the Somina settlement in Nikšić, with a maximum power of 240 MW.
As it was announced, the Government issued the investor with urban technical requirements for the preparation of technical documentation.
-According to previous analyzes conducted by the investor, it was determined that 240 MW is the maximum possible capacity of the future solar power plant. In accordance with the Law, all the necessary opinions of the competent authorities were previously obtained – it was stated in the discussion.

Sign up for business news updates & special reports.

Supported byMercosur Montenegro

RELATED ARTICLES

Supported byElevatePR DIgital
Supported by
Supported by
Supported by
error: Content is protected !!